Case Study

首页 > Case Study > Heat Pump Applications

Located in the west of Gegu Town, the south of Jingu Road and the east of the Innovation Cen-tre; the Gegu Stadium was completed in the second half of 2009. The stadium covers an area of 10000 m2 and construction area of 7000 m2 with a capacity of 2500 seats for both domestic and international games.

 

FutureVision was responsible for supply and installation of HVAC system which combined ver-tical ground-coupled and modular GSHP units.